Texas Gas Transmission, LLC (“Texas Gas”) is proposing the Eunice Reliability
and Lake Charles Supply Project ("Project") in order to support the long-term
reliability of its interstate pipeline system while simultaneously modernizing
existing facilities to reduce emissions and noise. The primary objective is to
increase reliability and bring Perryville, Louisiana supplies to the Lake
Charles area, enhancing the energy infrastructure in the region.
The Project includes the replacement of older, less efficient reciprocating
engines at its existing Eunice Compressor Station located in Acadia Parish,
Louisiana with two new gas turbine engines. This upgrade is designed to reduce
emissions and enhance operational reliability. The transition from older
reciprocating engines to modern gas turbine engines not only contributes to
lower emissions but also operates at lower noise levels.
Click image to download a copy of the Project one-pager.
Click image for interactive Project map.
Federal Energy Regulatory Commission (FERC) Project Docket Number: CP24-468
You may access copies of filings and issuances related to the Project at the FERC's online eLibrary, https://elibrary.ferc.gov/eLibrary/search, using the docket number listed above. For more information on how to get involved, visit the FERC's Online Overview .
You may also access copies of the Project FERC application at the following libraires local to the Project location:
Acadia Parish Library
1125 N. Parkerson Ave. Crowley, LA 70526
Jefferson Davis Parish Library – Jennings Headquarters Branch
118 W. Plaquemines St., Jennings, LA 70546
WANT TO LEARN MORE ABOUT TEXAS GAS AND BOARDWALK?
Watch this video about Texas Gas and our parent company, Boardwalk
Pipelines, LP, to learn more about our history, evolution, innovation,
sustainability, and employee culture.
CAREER OPPORTUNITIES
Interested in a career with Boardwalk Pipelines, LP? Visit our Career page for
information on working with Boardwalk and links to current job opportunities.
Careers